|
* 3/8” steel spikes fully welded in
a timed scroll pattern
* 10” frame beam (Standard)
* 12” frame beam (Heavy Duty)
* Two rows heavy duty reversible
heat treated scarifier shanks
* 5-9/16” dia. spiked roller tube
(Standard)
* 6-5/8” dia. spiked roller tube
(Heavy Duty)
* Complete with two 160 lbs.
compression roller springs
* O ptional 2nd spiked roller available
with 2-80 lb. compression
* Reversible heat treated 1/2” x
2” shanks
* 3 Pt. linkage, Cat. 1
* S elf aligning 1” bearing on roller
* F ormed plate “A” frame
* S hank spacing 2-13/16"
|